310, 2019

Fall 2019 Update

Utility Relocation will begin mid-October 2019. Remediation bids have been submitted and are currently being evaluated. Remediation work is scheduled to begin in November/December 2019.

2308, 2019

Summer 2019 Update

The Utility Relocation Design is complete and construction will begin in mid-September. There was a Remediation Contractor Bid walk down on July 17, 2019

1106, 2019

Soil Investigation

Teams performed additional soil investigations in March and May 2019 at the former library site.

904, 2019

Soil sampling

Soil samples were collected using Geoprobe equipment. The soil sample data is being evaluated.

2712, 2018

Demobilization

The old library building has been removed and equipment at the site has been demobilized.

1812, 2018

Braces Installed

Braces have been installed on the north and west walls.